I placed the PSU on the shoe rack, then moved on to test the RPi, Model B 256MB. I started testing WiFi dongle and HDMI cable. Everything went smoothly. Next step is the reset circuit and TP1/TP2 voltage test points.
I don't bother to test the AV and Ethernet connectors now, because I might not use them for a very long while.
.END
No comments:
Post a Comment